Stormwater Compliance for SIC Code 3142, Stormwater Permit Requirements
SIC Code 3142
2026 - 2027 Stormwater Permit Compliance for SIC Code 3142
This site focuses or refers to information and services regarding Southern Erosion Control BMPs Drainage Area Numeric Action Level (NAL) New Industrial General Permit Clean Water Act (CWA) Numeric Action Level (NAL) Exceedance Quality Assurance/Quality Control (QA/QC) Total Organic Carbon (TOC) Sedimentation National Pollutant Discharge Elimination System (NPDES) New Source Performance Standards (NSPS) Effluent Limitations Guidelines (ELGs) Non Storm Water Discharges (NSWD) Oil and Grease (O&G) Notice of Intent (NOI) New Discharge(r) Best Conventional Pollutant Control Technology (BCT) Trade Secret Storm Water Pollution Prevention Plan (SWPPP) Sediment Control BMPs Northern Stormwater Discharge Points Runoff Control BMPs Scrap Metal Permit Numeric Effluent Limitation (NEL) Minimum Level North American Industrial Classification System (NAICS) Third Party Environmental Group (TPEG) Flocculant Socks Turbidity Natural Background Debris Exceedance Response Action (ERA) Monitoring Requirements Total Dissolved Solids (TDS) Field Measurements Wattle Water Quality Standards Non Detect Run-on Wattles Stormwater Permit Division of Water Quality (DWQ) Stormwater Drainage Technology Based Effluent Limitation (TBEL) Best Practicable Control Technology Currently Available (BPT) Industrial Storm wattles Erosion Waste Discharge Identification Number (WDID) Structural Controls Sediment Stormwater Benchmarks Industrial General Permit (IGP) State water Board Stormwater Effective Date Regional Water Board United States Environmental Protection Agency (U.S. EPA) Storm Water Discharge Associated with Industrial Activity Waters of the United States Total Maximum Daily Load (TMDL) State Water Resources Control Board (SWRCB) Ontario Effluent Sheet Flow Notice of Termination (NOT) Storm Wattles Permit Registration Documents (PRDs) Monitoring Implementation Plan Best Available Technology Economically Achievable (BAT) Best Management Practices (BMP) Standard Industrial Classification (SIC) Discharger Storm Water Multiple Application and Report Tracking System (SMARTS) Water Quality Objectives Scheduled Facility Operating Hours Total Suspended Solids (TSS) Storm wattle Effluent Limitation Water Quality Based Effluent Limitation (WQBEL) Plastic Materials Non-Governmental Organization (NGO) Notice of Non Applicability (NONA) Municipal Separate Storm Sewer System (MS4) Non stormwater Multi Sector General Permit (MSGP) Biochemical Oxygen Demand (BOD) Operator Third Party Environmental Lawsuit (TPEL) Good Housekeeping BMPs Detected Not Quantifiable Chain of Custody Qualifying Storm Event (QSE) Storm Water Systems (SWS) Source Straw Wattles No Exposure Certification (NEC) Qualified Industrial Storm water Practitioner (QISP) Method Detection Limit Toxicity Legally Responsible Person (LRP) New Source Performance Standards Facility Industrial Materials Stormwater Guarantee Areas of Special Biological Significance (ASBS) pH and more.
In addition, stormwater hmbp non-stormwater observation stormwater safety inspection plan stormwater compliance audit stormwater vessels stormwater consultant stormwater treatment swppp stormwater hazardous materials business plan stormwater regulations stormwater management services stormwater osha stormwater rain information oil solidifying pillows stormwater osha safety and health inspection stormwater filtration media industrial wattle oil solidifying booms stormwater sand filters stormwater news plastic inlet filter stormwater plan of action stormwater quarterly observation stormwater expert witness stormwater regulations penalties non-stormwater observation report stormwater mechanical filtration united states stormwater engineer services environmental management stormwater record keeping stormwater annual report stormwater oil sheen sock stormwater sampling stormwater discharge stormwater runoff sampling health and safety consultation stormwater expert consultation stormwater benchmarks stormwater environmental stormwater observation report and more.
Do companies, sites, or facilities with sic code 3142 require a stormwater permit for NPDES compliance? Learn More.
Disclaimer: Self-help services (not legal advice). Site is not affiliated with any state agency.
Note that site might not contain the most updated information. No promise is made with regard to services or content's reliability, availabilty, or ability to meet any needs.
By using this site or contacting, you agree that no "attorney-client relationship" is formed.
National Guide for the Federal Water Pollution Control Act (1948) Amended by the Clean Water Act (1972)
33 U.S.C. § 1251 et seq.